Archive Mode. Call CEAD Works 2023 ended on 03/06/2023, 17:00. Call settings are read only. See Current Open Calls
Photograph of Installation on the col east of Sorrel. Second of 5 cast faces (Jesmonite on 2 metre steel rods) installed in a 30 kilometre line along the line of sight from Newgrange to Lugnaquilla